Minimal-impact North Vancouver Outdoor School

  • 1 / 25

    Project update June 2012 – Minimal-impact North Vancouver Outdoor School, Vancouver, BC, Canada

    The Environmental Learning Centre creates an experiential environment blending natural, human and building ecologies.

  • 2 / 25

    Project update June 2012 – Minimal-impact North Vancouver Outdoor School, Vancouver, BC, Canada

    The structure is raised above the threat of flooding from the river on its concrete pilotis.

  • 3 / 25

    Project update June 2012 – Minimal-impact North Vancouver Outdoor School, Vancouver, BC, Canada

    A sequential study of skylight orientation and structural impact on quality and distribution optimizes the use of natural light.

  • 4 / 25

    Project update June 2012 – Minimal-impact North Vancouver Outdoor School, Vancouver, BC, Canada

    Wood cladding is the dominant material on the walls, roof and soffit.

  • 5 / 25

    Project update June 2012 – Minimal-impact North Vancouver Outdoor School, Vancouver, BC, Canada

    Entrance to the building.

  • 6 / 25

    Project update June 2012 – Minimal-impact North Vancouver Outdoor School, Vancouver, BC, Canada

    The mixture of columns and tree trunks merge in such a way as to float the building into a hovering canopy.

  • 7 / 25

    Project update June 2012 – Minimal-impact North Vancouver Outdoor School, Vancouver, BC, Canada

    Skylights provide spatial interest to internal spaces and include automated glazed vents for stack-effect natural ventilation.

  • 8 / 25

    Project update June 2012 – Minimal-impact North Vancouver Outdoor School, Vancouver, BC, Canada

    The building provides a critical context for learning at the heart of a rural school campus near Vancouver, Canada.

  • 9 / 25

    Project update June 2012 – Minimal-impact North Vancouver Outdoor School, Vancouver, BC, Canada

    A strong composition in its simplicity: a pencil-box tree house on stilts, among the trees.

  • 10 / 25

    Project update June 2012 – Minimal-impact North Vancouver Outdoor School, Vancouver, BC, Canada

    Beneath the building becomes a “found” program space.

  • 11 / 25

    Project update June 2012 – Minimal-impact North Vancouver Outdoor School, Vancouver, BC, Canada

    The classroom spaces hover above the forest floor and provide direct views of the forest canopy.

  • 12 / 25

    Project update June 2012 – Minimal-impact North Vancouver Outdoor School, Vancouver, BC, Canada

    The carefully proportioned form is slotted between stands of mature conifers.

  • 13 / 25

    Holcim Awards 2008 ceremony for North America – Montreal, QC, Canada

    Holcim Awards Acknowledgement prize 2008 North America: (l-r) Craig Duffield, Larry McFarland and Ron Kato with Ray Cole (far right).

  • 14 / 25

    Holcim Awards 2008 ceremony for North America – Montreal, QC, Canada

    Holcim Awards Acknowledgement prize 2008 North America: (l-r) Craig Duffield, Ron Kato and Larry Duffield with Ray Cole (far right).

  • 15 / 25

    Project entry 2008 North America – Minimal-impact North Vancouver Outdoor School, Vancouver, BC, Canada

    Gateway to the North Vancouver Outdoor School: a demonstration facility promoting lifelong environmental stewardship.

  • 16 / 25

    Project entry 2008 North America – Minimal-impact North Vancouver Outdoor School, Vancouver, BC, Canada

    Micro-hydro, wind, solar and ground-source systems provide all the building’s energy, and become part of the school’s educational program.

  • 17 / 25

    Project entry 2008 North America – Minimal-impact North Vancouver Outdoor School, Vancouver, BC, Canada

    A diverse biological landscape.

  • 18 / 25

    Project entry 2008 North America – Minimal-impact North Vancouver Outdoor School, Vancouver, BC, Canada

    Master planning strategies.

  • 19 / 25

    Project entry 2008 North America – Minimal-impact North Vancouver Outdoor School, Vancouver, BC, Canada

    Habitat: strategies.

  • 20 / 25

    Project entry 2008 North America – Minimal-impact North Vancouver Outdoor School, Vancouver, BC, Canada

    Waterways: strategies.

  • 21 / 25

    Project entry 2008 North America – Minimal-impact North Vancouver Outdoor School, Vancouver, BC, Canada

    Air, water and waste.

  • 22 / 25

    Project entry 2008 North America – Minimal-impact North Vancouver Outdoor School, Vancouver, BC, Canada

    Construction methodology.

  • 23 / 25

    Project entry 2008 North America - "Minimal-impact North Vancouver Outdoor School, Vancouver, Canada": C

    Main floor plan.

  • 24 / 25

    Project entry 2008 North America - "Minimal-impact North Vancouver Outdoor School, Vancouver, Canada": C

    Ground level plan.

  • 25 / 25

    Project entry 2008 North America - "Minimal-impact North Vancouver Outdoor School, Vancouver, Canada": C

    Holcim Awards Acknowledgement prize 2008 North America: (l-r) Craig Duffield, Larry McFarland, Ron Kato.

  • Awards Acknowledgement prize 2008–2009 North America

Damaged by frequent, serious flooding, an environmental learning center that has fallen into disrepair over the years will be rebuilt. The building is completely self-reliant and CO2-neutral. Elevated on a structural platform offering spectacular views and access to nature, the building’s placement also offers protection against future flood concerns.

By Ron Kato - McFarland Marceau Architects, Vancouver, Canada and

Ideas: Embodied Carbon , Circular Design

Damaged by frequent, serious flooding, an environmental learning center that has fallen into disrepair over the years will be rebuilt.

The Minimal impact North Vancouver Outdoor School is completely self-reliant and CO2-neutral. Elevated on a structural platform offering spectacular views and access to nature, the building’s placement also offers protection against future flood concerns.

Minimal-impact North Vancouver Outdoor School

Project authors

  • Ron Kato

    McFarland Marceau Architects

    Canada

  • Larry McFarland

    McFarland Marceau Architects

    Canada

  • Craig Duffield

    McFarland Marceau Architects

    Canada

Project updates