• 1 / 11

    Project entry 2011 Africa Middle East – Secondary school with passive ventilation system, Gando, Burkina Faso

    Project entry 2011 - Secondary school with passive ventilation system, Gando, Burkina Faso: Aerial view.

  • 2 / 11

    Project entry 2011 Africa Middle East – Secondary school with passive ventilation system, Gando, Burkina Faso

    Project entry 2011 - Secondary school with passive ventilation system, Gando, Burkina Faso: Climate concept

  • 3 / 11

    Project entry 2011 Africa Middle East – Secondary school with passive ventilation system, Gando, Burkina Faso

    Site plan.

  • 4 / 11

    Project entry 2011 Africa Middle East – Secondary school with passive ventilation system, Gando, Burkina Faso

    Project phases.

  • 5 / 11

    Project entry 2011 Africa Middle East – Secondary school with passive ventilation system, Gando, Burkina Faso

    Project entry 2011 - Secondary school with passive ventilation system, Gando, Burkina Faso: Project objectives.

  • 6 / 11

    Project entry 2011 Africa Middle East – Secondary school with passive ventilation system, Gando, Burkina Faso

    Project entry 2011 - Secondary school with passive ventilation system, Gando, Burkina Faso: Courtyard.

  • 7 / 11

    Project entry 2011 Africa Middle East – Secondary school with passive ventilation system, Gando, Burkina Faso

    Project entry 2011 - Secondary school with passive ventilation system, Gando, Burkina Faso: Plan.

  • 8 / 11

    Project entry 2011 Africa Middle East – Secondary school with passive ventilation system, Gando, Burkina Faso

    Project entry 2011 - Secondary school with passive ventilation system, Gando, Burkina Faso: Entrance perspective.

  • 9 / 11

    Project entry 2011 Africa Middle East – Secondary school with passive ventilation system, Gando, Burkina Faso

    Project entry 2011 - Secondary school with passive ventilation system, Gando, Burkina Faso: Cross section.

  • 10 / 11

    Project entry 2011 Africa Middle East – Secondary school with passive ventilation system, Gando, Burkina Faso

    Secondary school with passive ventilation system, Gando, Burkina Faso: Buffer zone.

  • 11 / 11

    Project entry 2011 Africa Middle East – Secondary school with passive ventilation system, …

    Project entry 2011 Africa Middle East – Secondary school with passive ventilation system, Gando, Burkina Faso

The project aims for the sustainable use of resources to provide natural ventilation without any use of electricity. The natural ventilation system works with low-tech, cost-effective earth-tubes, which is a sustainable, zero-energy passive geothermal solar cooling system. The school will provide graduate students accessibility to further education and therefore enhances the sustainability of the educational opportunities created.

Last updated: March 31, 2011 Gando, Burkina Faso

The extremely hot weather makes studying in buildings without air-conditioning very difficult. That is why all interior spaces are embedded partially underground in the redesigned landscape to create a shadowed oasis. Due to the massive deforestation which has taken part in the past, the region is now facing the expansion of the desert. To prevent the dehydration of the ground, collected rainwater irrigates the recently planted trees around the existing school buildings. The reforestation is continued in the Secondary School Gando and creates leisure space.